Process
and Machine Problems
Listed below are the results of five of the most common machine-crash situations: 1. Hot-leak caused 14 days downtime and very high service-specialist cost 2. An RF-etch failure caused total damage to 400 wafers 3. HV spikes (‘glitches’) caused partial damage to 700 wafers 4. Heater temperature-control failure caused damage to hundreds of wafers 5. Operator that selected the wrong process caused the scrap of 500 wafers As
an example, only the damage caused by RF-etch failure was computed:
The
TadiGuard Solutions
In
addition, the TadiGuard locks the machine in order to avoid wrong processes.
It monitors and keeps the wafer temperature within boundaries, fully tracks
the vacuum and its rate-of-change, and inhibits all the above mentioned
potential crash situations. All these benefits for the cost of less than
ten percent of the loss caused by one event!
Ultimate Results
Typical Varian 3290 screens Zoomed in display shows typical pumpdown curve and
pumps / valve sequence Simple 3290 user-drawn real-time machine Mimics screen |